J Clark Eagle Project
The project is to build two permanent benches, one two sided and one single sided, for the Shades Mountain Baptist Church soccer field.
There will be two workdays on Saturdays to complete this project.
1. Saturday, August 25th Time: 9:00 AM - 2:00 PM Location: 3550 Atvonn Drive Hoover 35226
Lunch will be provided. Tools Needed: drills, circular saws, tape measures
After all wood is cut for the project, swimming will be available.
2. Saturday, September 8th Time: 9:00 AM - 4:00 PM Location: Shades Mountain Baptist Church 2017 Columbiana Road
Vestavia Hills, AL 35216 Soccer Field Pavilion. Lunch will be provided
Tools Needed:drills, circular saws, tape measures, 1 post hole digger, 1 wheel barrow, 3 -4 Extension chords, Socket
Wrenches & Sockets, Levels, Shovels
Water will be provided on each work day.
Donations are being accepted for this project.
Please make checks out to troop 21 and put J Clark eagle project in memo section of check.
Your in Christ,
J Clark
0 Comments:
Post a Comment
<< Home